Newsonlive
Kerala

Long-overdue digital survey for Thammanam–Pullepady Road project gets under way

Project aims to construct a 3.7-km-long four-lane road linking MG Road with the Edappally–Vyttila NH 66 Bypass by widening and extending the Thammanam–Pullepady Road

The HinduThe Hindu
Published: 5 July 2026
Long-overdue digital survey for Thammanam–Pullepady Road project gets under way
Project aims to construct a 3.7-km-long four-lane road linking MG Road with the Edappally–Vyttila NH 66 Bypass by widening and extending the Thammanam–Pullepady Road

This article was originally published by an external source. Read the full story at the source.

Read Full Article at Source ↗