Newsonlive
Kerala

Keralam power crisis: Regulatory panel urges KSEB to fast-track battery energy storage projects

Indications are that all the five large-scale battery energy storage systems (BESS) planned across the State are likely to be in place only toward the end of 2026

The HinduThe Hindu
Published: 15 September 2026
Keralam power crisis: Regulatory panel urges KSEB to fast-track battery energy storage projects
Indications are that all the five large-scale battery energy storage systems (BESS) planned across the State are likely to be in place only toward the end of 2026

This article was originally published by an external source. Read the full story at the source.

Read Full Article at Source ↗