Newsonlive
Kerala

Inland waterway proposed to link Kottayam port with Vizhinjam

The 180-km journey from Kottayam to Vizhinjam is expected to take 12 to 14 hours. The waterway, with 17 bridges, maintains a depth of around 2 m, making it navigable for container barges.

The HinduThe Hindu
Published: 31 October 2026
Inland waterway proposed to link Kottayam port with Vizhinjam
The 180-km journey from Kottayam to Vizhinjam is expected to take 12 to 14 hours. The waterway, with 17 bridges, maintains a depth of around 2 m, making it navigable for container barges.

This article was originally published by an external source. Read the full story at the source.

Read Full Article at Source ↗