
The train will run at a speed of 320 kilometres per hour along the 508-kilometre-long high-speed rail corridor and is expected to become operational by August 15, 2027.
The train will run at a speed of 320 kilometres per hour along the 508-kilometre-long high-speed rail corridor and is expected to become operational by August 15, 2027.

This article was originally published by an external source. Read the full story at the source.
Read Full Article at Source ↗