The master plan for the station includes upgrading both platform 1 and platform 2 to a standard height of 84 cm, alongside extending their length on either side
Eravipuram railway station development works to finish by January 2027
The master plan for the station includes upgrading both platform 1 and platform 2 to a standard height of 84 cm, alongside extending their length on either side
Published: 21 August 2026
This article was originally published by an external source. Read the full story at the source.
Read Full Article at Source ↗