The 17-km-long Edappally-Aroor NH bypass is feared to become a bottleneck once the NHAI completes the six-laning of the rest of NH 66 in Keralam by 2028, with traffic from the 10-lane Thuravoor-Aroor stretch adding to the congestion
CoRWA summit to discuss NH 66 bypass woes, delay in Kochi metro’s Kakkanad extension
The 17-km-long Edappally-Aroor NH bypass is feared to become a bottleneck once the NHAI completes the six-laning of the rest of NH 66 in Keralam by 2028, with traffic from the 10-lane Thuravoor-Aroor stretch adding to the congestion
Published: 23 October 2026
This article was originally published by an external source. Read the full story at the source.
Read Full Article at Source ↗