
Keralam will need at least 27 gigawatts of renewable capacity addition to meet the 2040 electricity demand purely from renewables, hydro and nuclear without any thermal power support, according to a study by WRI India
Keralam will need at least 27 gigawatts of renewable capacity addition to meet the 2040 electricity demand purely from renewables, hydro and nuclear without any thermal power support, according to a study by WRI India

This article was originally published by an external source. Read the full story at the source.
Read Full Article at Source ↗